About us     Sign in newsletter     FAQ     Disclaimer     
                     
You are here: Investors » Opportunities » Projects
Projects
Up one level
 
Component No.1 Project of drainage and pollution treatment at Tham Luong – Ben Cat – Rach Nuoc Len channels (phase 2)
  Improving water environment at Tham Luong – Ben Cat – Nuoc Len Canal.
Component No.5 Project of drainage and pollution treatment at Tham Luong – Ben Cat – Rach Nuoc Len channels (phase 2)
  Project of drainage and pollution treatment at Tham Luong – Ben Cat – Rach Nuoc Len channels (phase 2). Productivity: 150,000 m3/day night. Located at Tan Phu District.
Metro line No.4B
  Length: 5.2 km. Located in District Go Vap, Tan Binh. Build according to Decision No.5754/QD-UBND dated 12/11/2012 of the People’s Committee on approving the list of BOT, BT projects calling for investment.
Metro line No.4
  Length: 20 km. Width: 60m – 120m. Located in District 12, Go Vap, Tan Binh, Phu Nhua, 1, 3, 4. Build to complete center – oriented axis.
Improve city’s water environment – phase 3
  Water improvement Project in Ho Chi Minh city at Tau Hu – Ben Nghe – Doi Te Area, phase 3 aims at integrating with the drainage and water treatment system that has been developed in phase 1 and being implemented in phase 2 in order to improve the drainage system, contributing to protect the environment, gentrification, life quality…
Metro line No.5 Phase 2
  The name is Metro line No.5, Phase 2 (from Bay Hien intersection – New Can Giuoc Bus Station) and Depot at Binh Chanh. Located from District 5, 8, 10, 11 to Binh Chanh District.
Ben Thanh station
  Located at Quach Thi Trang Square with the value up to 830 million USD
Metro line No.3B
  Metro line No.3B – Alignment: Cong Hoa Roundabout – Nguyen Thi Minh Khai – Xo Viet Nghe Tinh – Highway No.13th – Hiep Binh Phuoc. 12.1 km in length.
Metro line No.3A
  Metro line No.3A – Alignment: Ben Thanh (Quach Thị Trang square) – Pham Ngu Lao – Cong Hoa Roundabout – Hung Vuong – Hong Bang – Kinh Duong Vuong – Tan Kien Depot – Tan Kien station. 22.6 km in length.
Tramway No.03 (Go Vap intersection – Quang Trung software park – Tan Thoi Hiep train station)
  To combine urban railway system, fitting the master planning, integrating with other services and commercials; providing mass public transport that is safe and environment-friendly.
Metro line No.2 – phase II: Ben Thanh – Thu Thiem and Tham Luong – Tay Ninh Bus terminal
  To complete Urban railway system, fitting the master planning, ingegrating with other services and commercials; providing mass public transport that is safe and environment-friendly.
Northwest oriented route (from Long An boundary to Vinh Loc Industrial Park)
  Complete regional transportation system
Road connecting Rach Chiec 2 Bridge and Binh Thai intersection
  Complete regional transportation system
Connecting road from Linh Dong Intersection to Go Duc Junction
  Complete regional transportation system
Tramway No.2 (from Nguyen Van Linh street – District 2)
  To complete Urban railway system, fitting the master planning, ingegrating with other services and commercials; providing mass public transport that is safe and environment-friendly.
Build road parallel with Nguyen Van Tao Road
  Meet the needs of transportation, urbanization in Hiep Phuoc Industry and Urban Zone.
Upgrade and expand the Provincial Highway No.9
 
Upgrade Dang Thuc Vinh Road
  Upgrade Dang Thuc Vinh Road (Provincial Route 9)
Connecting Eastern Ring Road – Hanoi Highway
  Build road connecting Eastern Ring Road – Hanoi Highway (Binh Thai street – Eastern Ring Road)
Upgrade and expand the Provincial Highway 15
  Complete regional transportation system, contributing to economic – social development along Provincial Highway 15.
      1   2   3   4